a) an error
b) a fault
c) a failure
d) a defect
Q2. Regression testing should be performed:
v) every week
W) after the software has changed
x) as often as possible
y) when the environment has changed
z) when the project manager says
a) v & w are true, x, y & z are false
b) w, x & y are true, v & z are false
c) w & y are true, v, x & z are false
d) w is true, v, x, y & z are false
Q3. IEEE 829 test plan documentation standard contains all of the following except
a) test items
b) test deliverables
c) test tasks
d) test specifications
a) when all the planned tests have been run
b) when time has run out
c) when all faults have been fixed correctly
d) it depends on the risks for the system being tested
Q5. Order numbers on a stock control system can range between 10000 and 99999 inclusive. Which of the following inputs might be a result of designing tests for only valid equivalence classes and valid boundaries?
a) 1000, 50000, 99999
b) 9999, 50000, 100000
c) 10000, 50000, 99999d) 10000, 99999, 100000
Q6. Consider the following statements about early test design:
ii. faults found during early test design are more expensive to fix
iii. early test design can find faults
iv. early test design can cause changes to the requirements
v. early test design normally takes more effort
a) i, iii & iv are true; ii & v are false
b) iii & iv are true; i, ii & v are false
c) i, iii, iv & v are true; ii is falsed) i & ii are true; iii, iv & v are false
Q7. Non-functional system testing includes:
b) testing quality attributes of the system including performance and usability
c) testing a system function using only the software required for that function
d) testing for functions that should not exist
Q8. Which of the following is NOT part of configuration management?
a) auditing conformance to ISO 9000
b) status accounting of configuration items
c) identification of test versions
d) controlled library access
Q9. Which of the following is the main purpose of the integration strategy for integration testing in the small?
a) to ensure that all of the small modules are tested adequately
b) to ensure that the system interfaces to other systems and networks
c) to specify which modules to combine when, and how many at once
d) to specify how the software should be divided into modules
a) to know when a specific test has finished its execution
b) to ensure that the test case specification is complete
c) to set the criteria used in generating test inputs
d) to determine when to stop testing
Q11. Consider the following statements:
i. an incident may be closed without being fixed.
ii. incidents may not be raised against documentation.
iii. the final stage of incident tracking is fixing.
iv. the incident record does not include information on test environments.a) ii is true, i, iii and iv are false
b) i is true, ii, iii and iv are false
c) i and iv are true, ii and iii are false
d) i and ii are true, iii and iv are falseQ12. Given the following code, which statement is true about the minimum number of test cases required for full statement and branch coverage?
Read p
Read q
IF p+q > 100 THEN
Print "Large"
ENDIF
IF p > 50 THEN
Print
"p Large"
ENDIF
a) 1 test for statement coverage, 3 for branch coverage
b) 1 test for statement coverage, 2 for branch coverage
c) 1 test for statement coverage, 1 for branch coverage
d) 2 tests for statement coverage, 2 for branch coverage
Q13. Consider the following statements:
i. 100% statement coverage guarantees 100% branch coverage.
ii. 100% branch coverage guarantees 100% statement coverage.
iii. 100% branch coverage guarantees 100% decision coverage.
iv. 100% decision coverage guarantees 100% branch coverage.
v. 100% statement coverage guarantees 100% decision coverage.
a) ii is True; i, iii, iv & v are False
b) i & v are True; ii, iii & iv are False
c) ii & iii are True; i, iv & v are False
d) ii, iii & iv are True; i & v are False
Q14. Functional system testing is:
a) testing that the system functions with other systems
b) testing that the components that comprise the system function together
c) testing the end to end functionality of the system as a whole
d) testing the system performs functions within specified response times
Q15. Incidents would not be raised against:
a) requirements
b) documentation
c) test cases
d) improvements suggested by users
Q16. Which of the following items would not come under Configuration Management?
a) operating systems
b) test documentation
c) live data
d) user requirement documents
Q17. Maintenance testing is:
a) updating tests when the software has changed
b) testing a released system that has been changed
c) testing by users to ensure that the system meets a business need
d) testing to maintain business advantage
Q18. What can static analysis NOT find?
a) the use of a variable before it has been defined
b) unreachable (“dead”) code
c) memory leaks
d) array bound violations
Q19. Which of the following techniques is NOT a black box technique?
a) state transition testing
b) LCSAJ
c) syntax testing
d) boundary value analysis
Q20. Beta testing is:
a) performed by customers at their own site
b) performed by customers at the software developer's
site
c) performed by an Independent Test Team
d) performed as early as possible in the lifecycle
Q21. Given the following types of tool, which tools would typically be used by developers, and which by an independent system test team?
i. static analysis
ii. performance testing
iii. test management
iv. dynamic analysis
a) developers would typically use i and iv; test team ii and iii
b) developers would typically use i and iii; test team ii and iv
c) developers would typically use ii and iv; test team i and iii
d) developers would typically use i, iii and iv; test team ii
Q22. The main focus of acceptance testing is:
a) finding faults in the system
b) ensuring that the system is acceptable to all users
c) testing the system with other systems
d) testing from a business perspective
Q23. Which of the following statements about component testing is FALSE?
a) black box test design techniques all have an associated test measurement technique
b) white box test design techniques all have an associated test measurement technique
c) cyclomatic complexity is not a test measurement technique
d) black box test measurement techniques all have an associated test design technique
Q24. Which of the following statements is NOT true?
a) inspection is the most formal review process
b) inspections should be led by a trained leader
c) managers can perform inspections on management documents
d) inspection is appropriate even when there are no written documents
Q25. A typical commercial test execution tool would be able to perform all of the following, EXCEPT:
a) calculating expected outputs
b) comparison of expected outcomes with actual outcomes
c) recording test inputs
d) reading test values from a data file
Q26. The difference between re-testing and regression testing is:
a) re-testing ensures the original fault has been removed; regression testing looks for unexpected side-effects
b) re-testing looks for unexpected side-effects; regression testing ensures the original fault has been removed
c) re-testing is done after faults are fixed; regression testing is done earlier
d) re-testing is done by developers; regression testing is done by independent testers
Q27. Expected results are:
a) only important in system testing
b) only used in component testing
c) most useful when specified in advance
d) derived from the code
Q28. What type of review requires formal entry and exit criteria, including metrics:
a) walkthrough
b) inspection
c) management review
d) post project review
Q29. Which of the following uses Impact Analysis most?
a) component testing
b) non-functional system testing
c) user acceptance testing
d) maintenance testing
Q30. What is NOT included in typical costs for an inspection process?
a) setting up forms and databases
b) analysing metrics and improving processes
c) writing the documents to be inspected
d) time spent on the document outside the meeting
Q31. Which of the following is NOT a reasonable test objective:
a) to find faults in the software
b) to prove that the software has no faults
c) to give confidence in the software
d) to find performance problems
Q32. Which expression best matches the following characteristics of the review processes:
1. led by the author
2. undocumented
3. no management participation
4. led by a moderator or leader
5. uses entry and exit criteria
s) inspection
t) peer review
u) informal review
v) walkthrough
a) s = 4 and 5, t = 3, u = 2, v = 1
b) s = 4, t = 3, u = 2 and 5, v = 1
c) s = 1 and 5, t = 3, u = 2, v = 4
d) s = 4 and 5, t = 1, u= 2, v = 3
Q33. Which of the following is NOT part of system testing?
a) business process-based testing
b) performance, load and stress testing
c) usability testing
d) top-down integration testing
Q34. Which statement about expected outcomes is FALSE?
a) expected outcomes are defined by the software's behaviour
b) expected outcomes are derived from a specification, not from the code
c) expected outcomes should be predicted before a test is run
d) expected outcomes may include timing constraints such as response times
Q35. The standard that gives definitions of testing terms is:
a) ISO/IEC 12207
b) BS 7925-1
c) ANSI/IEEE 829
d) ANSI/IEEE 729
Q36. The cost of fixing a fault:
a) is not important
b) increases the later a fault is found
c) decreases the later a fault is found
d) can never be determined
Q37. Which of the following is NOT included in the Test Plan document of the Test Documentation Standard?
a) what is not to be tested
b) test environment properties
c) quality plans
d) schedules and deadlines
Q38. Could reviews or inspections be considered part of testing?
a) no, because they apply to development documentation
b) no, because they are normally applied before testing
c) yes, because both help detect faults and improve quality
d) yes, because testing includes all non-constructive activities
Q39. Which of the following is not part of performance testing?
a) measuring response times
b) recovery testing
c) simulating many users
d) generating many transactions
Q40. Error guessing is best used:
a) after more formal techniques have been applied
b) as the first approach to deriving test cases
c) by inexperienced testers
d) after the system has gone live
Below are the answers of the questions of this post:
yurtdışı kargo
ReplyDeleteresimli magnet
instagram takipçi satın al
yurtdışı kargo
sms onay
dijital kartvizit
dijital kartvizit
https://nobetci-eczane.org/
1AV6
Hollanda yurtdışı kargo
ReplyDeleteİrlanda yurtdışı kargo
İspanya yurtdışı kargo
İtalya yurtdışı kargo
Letonya yurtdışı kargo
HM5ZW1
Litvanya yurtdışı kargo
ReplyDeleteLüksemburg yurtdışı kargo
Macaristan yurtdışı kargo
Malta yurtdışı kargo
Polonya yurtdışı kargo
D2Z